lock and key

Please login!

 
Username:  

no account yet?register now.

Password:   Registration
Security code   Forgotten your password
     
 

Company Detail

Hitachi Rail STS Genova  

Street: Via Paolo Mantovani 3-5 Phone: +39 010 6552111
ZIP Code/ City: 16151 Genova Fax: +39 010 6552939
Country: Italy Url: http://sts.hitachirail.com/en
DUNS Number: 351347232
Total number of employees (including permanent, part time, contract, temporary, in site extensions and in remote functions employees): 526 Total number of employees on site, related to the rail business (including permanent, part time, contract, and temporary employees): 526
Total number of employees in remote locations, related to the rail business (including permanent, parttime, contract, and temporary employees): 0 Total number of employees in site extensions, related to the rail business (including permanent, parttime, contract, and temporary employees): 0


Contact Person

Full Name: Mr. Head of Quality Assurance Paolo Patti
Email Address: paolo.patti@hitachirail.com
Phone: +39 3483303470


Subsidiary/ Location


Ansaldo STS Railway Signaling Technology (Beijing) Company Limited  Beijing /China
Hitachi Rail STS France Les Ulis  Les Ulis Cedex /France
Hitachi Rail STS France Riom  RIOM /France
Hitachi Rail STS Sweden  Solna /Sweden
Hitachi Rail STS Tito Scalo  Tito Scalo (PZ) /Italy
Hitachi Rail STS USA Batesburg  Batesburg, SC /United States
Hitachi Rail STS USA Pittsburgh  Pittsburgh /United States


Certificates


  Performance Level Standard Product Categories Activity Date of Audit /
Audit valid until
Certificate valid from /
Certificate valid until /
Current date
IRIS rev. 03
  • 04 - Power system, drive unit
  • 08 - Control apparatus for train operations
  • 09 - Passenger Information Systems (PIS)
  • 10 - Communication, monitoring and safety equipment
  • 18 - Infrastructure
Design
Maintenance
26.04.2018 /
18.12.2019
26.04.2018 /
18.12.2021 /
17.07.2018
IRIS Rev 02, V2.4
  • 4 - Power system
  • 9 - On board vehicle control
  • 10 - Passenger information system
  • 11 - Communication system
  • 19 - Infrastructure
Design
Maintenance
13.07.2017 /
18.12.2018
19.12.2017 /
18.12.2020 /
13.09.2017
IRIS Rev 02, V2.4
  • 4 - Power system
  • 9 - On board vehicle control
  • 10 - Passenger information system
  • 11 - Communication system
  • 19 - Infrastructure
Design
Maintenance
04.11.2016 /
18.12.2017
- /
- /
-
IRIS Rev 02, V2.3
  • 4 - Power system
  • 9 - On board vehicle control
  • 10 - Passenger information system
  • 11 - Communication system
  • 19 - Infrastructure
Design
Maintenance
11.11.2015 /
18.12.2016
- /
- /
-
IRIS Rev 02, V2.3
  • 4 - Power system
  • 9 - On board vehicle control
  • 10 - Passenger information system
  • 11 - Communication system
  • 19 - Infrastructure
Design
Maintenance
19.12.2014 /
18.12.2015
19.12.2014 /
18.12.2017 /
05.01.2015


Back